Name | Last modified | Size | Description | |
---|---|---|---|---|
Parent Directory | - | |||
TIM E-1 Lab Control Panel Details & Symbol List.tif | 2020-03-20 12:38 | 2.5M | ||
TIM E-2 Basement Floor Plan Lighting.tif | 2020-03-20 12:38 | 2.4M | ||
TIM E-3 Basement Floor Plan Power.tif | 2020-03-20 12:38 | 2.7M | ||
TIM E-4 First Floor Plan Lighting.tif | 2020-03-20 12:38 | 2.8M | ||
TIM E-5 First Floor Plan Power.tif | 2020-03-20 12:38 | 3.3M | ||
TIM E-6 Mezzanine & Roof Plans Lighting & Power (2).tif | 2020-03-20 12:38 | 1.8M | ||
TIM E-8 Miscellaneous Riser Diagrams.tif | 2020-03-20 12:38 | 5.8M | ||
TIM E-9 Laboratory Equipment Details.tif | 2020-03-20 12:38 | 4.2M | ||
TIM E-10 Laboratory Equipment Riser Diagram & Schedule.tif | 2020-03-20 12:38 | 5.5M | ||
TIM E-11 Panel Schedule & Stowell Hall Renovation.tif | 2020-03-20 12:38 | 5.1M | ||